ALAMO SOUTH PROJECT OVERVIEW
*Please note: Project has not been awarded and is currently in the bidding stage.
Project Scope
The Project components include the design and construction of the improvements, which are briefly summarized below:
Additional elevated mainlanes comprised of:
-
Two GP lanes in each direction from I-410 North to Petroleum Drive
-
One HOV lane in each direction from I-410 North to Petroleum Drive
-
Connection to the elevated lanes and direct connectors at the I-35/I-410 North interchange being constructed as part of the I-35 Northeast Expansion Central Project
-
Two direct connectors at the I-410 South interchange to connect the elevated lanes
-
Elevated lane transitions along approximately 1/4 mile of I-410 South
Mar. 2023
Proposal
Due
May 2023
Conditional Award
Aug. 2023
Contract Execution
2024
Construction