Project Scope

The Project components include the design and construction of the improvements, which are briefly summarized below:

Additional elevated mainlanes comprised of:

  • Two GP lanes in each direction from I-410 North to Petroleum Drive

  • One HOV lane in each direction from I-410 North to Petroleum Drive

  • Connection to the elevated lanes and direct connectors at the I-35/I-410 North interchange being constructed as part of the I-35 Northeast Expansion Central Project

  • Two direct connectors at the I-410 South interchange to connect the elevated lanes

  • Elevated lane transitions along approximately 1/4 mile of I-410 South

condition.png

Mar. 2023

Proposal

Due

May 2023

Conditional Award

Aug. 2023

Contract Execution

 2024

Construction